South Africa Redstone 100 MW Tower Solar Thermal Project South Africa Redstone 100 MW Tower Solar Thermal Project
Query
Keywords:
High- and low-pressure heaters
Case Introduction
Heater for the heating network
There are two types of district‑heating feedwater heaters: standard district‑heating heaters and peak‑load district‑heating heaters. These heaters are used in power plants to heat the water supplied to the district heating network. The heating steam is either extracted from a higher‑pressure turbine stage or generated by superheated steam drawn from the boiler, which is then desuperheated and depressurized before being used as the heat source to raise the district‑heating water to the required supply temperature.
The primary district‑heating heater operates continuously throughout the heating season and can meet the vast majority of water‑temperature requirements. During the coldest periods of winter, when higher supply temperatures are needed, the water exiting the primary heater is routed to a second heater connected in series, known as the peak‑load district‑heating heater.
High-pressure heater
Product Type: Horizontal, Vertical
Heat exchanger tube type and material: U‑bend carbon steel tubes, stainless steel tubes, alloy tubes.
Water chamber structural configuration: large opening self-sealing, hemispherical + small opening self-sealing.
Shell-side configuration: single-section (condensation section), two-section (superheated steam cooling section and condensation section), three-section (superheated steam cooling section, condensation section, and condensate cooling section).
Key technologies: The heat exchange tubes are joined to the tube sheet by a combination of strength welding and hydraulic expansion; the water inlet of the heat exchanger is equipped with flow‑distribution plates and stainless‑steel wear‑resistant sleeves.
Low-pressure heater
Product Type: Horizontal, Vertical
Heat exchanger tube types and materials: U‑bend stainless steel tubes, copper tubes, carbon steel tubes.
Water chamber configuration: cylindrical short section with elliptical end caps.
Connection method between the water chamber and the shell: flanged and bolted connection, or all-welded type.
Shell-side configuration: single-section (condensation section), two-section (superheated steam cooling section and condensation section), three-section (superheated steam cooling section, condensation section, and condensate cooling section)
| Serial number |
Country of the project |
Customer Name |
Project Name |
Specification Model |
Quantity |
Ordering time |
Note |
| 1 |
Morocco |
Shandong Electric Power Construction No. 3 Engineering Co., Ltd. |
Morocco Noor II 200 MW Concentrated Solar Power Plant Project |
JG-1260-1/JG-1100-2/JD-1190-1 |
5 |
2015.10 |
ASME |
| 2 |
South Africa |
Shandong Electric Power Construction No. 3 Engineering Co., Ltd. |
South Africa Redstone 100 MW Tower Solar Thermal Project |
JG-320-6/JG-500-7/JD-345-1/JD-345-2 |
8 |
2021.11 |
ASME U |
| 3 |
Indonesia |
China Huadian Engineering & Technology Group Co., Ltd. |
Indonesia Batam 2×65 MW Coal-fired Power Plant Project |
JG-240-2 |
1 |
2024.11 |
/ |
| 4 |
Russia |
Engineering Technology Branch of Xi’an Shangu Power Co., Ltd. |
Russia RUKS Gas Power Generation Project |
HP-450-1/HP-480-1/HP-500-1 |
3 |
2025.02 |
/ |
| 5 |
Canada |
Valmet Technology Co., Ltd. |
Canada’s Irving New Recycling Boiler Project |
NEU1500-1005 |
1 |
2025.02 |
ASME U/CRN Registration |
| 6 |
Brazil |
Valmet Technology Co., Ltd. |
Brazil |
NEU1000-320 |
1 |
2025.02 |
ASME+NR-13 |
| 7 |
Philippines |
China Energy Construction Group Northeast Electric Power First Engineering Co., Ltd. |
Philippine Misamis Expansion Project |
JG-320-1 |
2 |
2025.03 |
ASME |
| 8 |
Indonesia |
Valmet Technology Co., Ltd. |
Indonesia OKI Phase II |
JG-735 |
1 |
2025.04 |
ASME |
| 9 |
Finland |
Valmet Technology Co., Ltd. |
Valmet Örtofta_BFB Project |
JG-165 |
2 |
2025.09 |
ASME |
| 10 |
Kazakhstan |
Shuangliang Energy Saving System Co., Ltd. |
Expansion Project of Unit 7, Boiler No. 9 at Karaganda Thermal Power Plant No. 3 in Kazakhstan |
JG-440-1 |
1 |
2025.10 |
/ |
Manual Download
Request a quote now
Please provide your contact information and specify your requirements, and we will arrange for a dedicated representative to get in touch with you.
South Africa Redstone 100 MW Tower Solar Thermal Project South Africa Redstone 100 MW Tower Solar Thermal Project
Keywords:
High- and low-pressure heaters
Contact Us
Sales Department Phone:
Tel: +86-0531-87510324
Fax: +86-0531-87983154
After-sales Service Department Phone:
Tel: +86-0531-87510324
Company email:
Email: jpvf@jirong.net.cn
Email: sales@jirong-thermal.com
Company Address:
Mailing Address: No. 18 Huaxin Road, Jinan City, Shandong Province
WeChat Official Account

Please tell us your requirements.
We recommend and carefully select suitable products for you.
Latest product More +
High-pressure membrane-type deaerator
High adaptability: It can achieve deoxygenation under conditions of low‑temperature influent and high‑oxygen‑content influent, provided that a sufficient steam flow is maintained.
Low-pressure film-type deaerator
High adaptability: It can achieve deoxygenation under conditions of low‑temperature influent and high‑oxygen‑content influent, provided that a sufficient steam flow is maintained.
High-pressure internal deaerator
Reduce costs associated with insulation, platforms, piping, and feedwater recirculation pumps.