Thailand TPI PP 150MW Power Plant Project 1 × 150MW Condensing Generator Unit High Pressure Deaerator Smooth Delivery
Published:
2020-01-15
The project is located in the Salabri TPIPL cement plant, about 150 kilometers northeast of Bangkok, Thailand. It will build a 1 × 150MW condensing steam turbine generator unit with a 1 × 506 t/h ultra-high pressure intermediate reheat circulating fluidized bed boiler.
The project is located in Salabri TPI PL Cement Plant, about 150 kilometers northeast of Bangkok, Thailand. It will build a 1 × 150MW condensing steam turbine generator unit with a 1 × 506 t/h ultra-high pressure intermediate reheat circulating fluidized bed boiler.
Technical parameters of deaerator and water storage tank
Deaerator output: ≈ 531 t/h
Maximum working pressure of heating steam: 1.1448MPa(a)
Maximum working temperature of heating steam: 397.6 ℃
Rated working pressure of heating steam: 1.0486 MPa(a)
Rated working temperature of heating steam: 395.8 ℃
Effective volume of water tank: 90m3
Key words:
150mw, steam, heating, working pressure, deaerator, water tank, maximum, rated, working temperature, middle
Related News
Jirong Thermal
Address: No. 18 Huaxin Road, Licheng District, Jinan City